Features :

Special core program for multi-rotor controllers greatly improves throttle response.Auto Timing Adjustment and Preset Parameters for easy operation.DEO (Driving Efficiency Optimization) technology significantly improves throttle linearity and driving efficiency.Open Cooling Fin.

Specification :

  • Output : Continuous 40A, Burst 60A up to 10 seconds
  • Input Voltage : 3-6cells lithium battery
  • BEC : NO BEC
  • Refresh rate of the throttle signal : up to 621Hz
  • Timing : High or Intermediate
  • Signal cable length : 560mm
  • Bullet Connector : 3.5mmSize : 73.5 x 23 x 11mm
  • Weight : 45g

Package Includes :

  • 2 X Hobbywing XRotor 40A Pro ESC (OPTO)
  • 1 X English Manual